Same building. Different cost base.
Send us the drawings — approved or not. We redesign the building as prefabricated, price it factory-direct, and install it in days. Same outcome, different cost base.
| 01 | In the factory | ~30 days | Built and finished under factory quality control |
| 02 | On the water | ~30 days | Shipped to the nearest port while we do footings, services and access |
| 03 | On site | Days | Craned, connected and certified — not months of trades |
Program starts at approved drawings. Site works run in parallel with manufacture.
Residential
Houses, duplexes and unit developments. The lower finished cost per square metre is what makes the business case stack. Designs can reach European passive house standards for higher-end builds.
Hotels, offices, accommodation
Repeatable rooms are where modular is strongest. Every unit can be fitted out and finished before it leaves the factory, or finished on site by local trades.
Workforce camps
Mine camps, temporary accommodation and remote villages, configured to the head count and the site.




Buildings produced through the factory partnerships behind our modular arm — the same manufacturing capability we bring to your project.



Dormitory wings, commercial kitchen and dining hall, laundry and amenities — all craned into place.
Curious whether your project suits modular?
Send the plans and the site address. We will price both methods and tell you which one we would build.
Talk to us
